Clays Mill Elementary School Renovation


Location

Lexington, Kentucky

Client

Clotfelter-Samokar

Completed

2011

Budget

$11,292,000 (Total Contract Award)

Description

CDP developed a stormwater drainage system utilizing a site plan and geotechnical analysis provided by the architect.  Best management practices listed in the Lexington-Fayette Urban County Government Stormwater Manual were used to treat stormwater runoff from the site’s impervious surfaces.  Calculations of the site’s pre and post construction stormwater runoff, proposed stormwater system hydraulics, water quality requirements and professional certification were also conducted to ensure that the design meets all requirements of Lexington-Fayette Urban County Government Division of Engineering.

Components

  • proposed drainage system design
  • addressed LFUCG Division of Engineering minimum water quality requirements
  • provided pre- and post-construction stormwater runoff calculations
  • incorporated a manufactured water quality unit